At the start of operations, five instruments will be deployed: a visible broadband imager (VTF), a visible spectropolarimeter (ViSP), a visible tunable filter (VTF), a diffraction-limited near-IR spectropolarimeter (DLNIRSP), and a cryogenic near-IR spectropolarimeter (cryo-NIRSP). At the end of 2017, the project finished its fifth year of construction and eighth year overall. Major milestones included delivery of the commissioning blank, the completed primary mirror (M1), and its cell. Commissioning and testing of the coudé rotator is complete and the installation of the coudé cleanroom is underway; likewise, commissioning of the telescope mount assembly (TMA) has also begun. Various other systems and equipment are also being installed and tested. Finally, the observatory integration, testing, and commissioning (IT&C) activities have begun, including the first coating of the M1 commissioning blank and its integration within its cell assembly. Science mirror coating and initial on-sky activities are both anticipated in 2018. |
ACCESS THE FULL ARTICLE
No SPIE Account? Create one
CITATIONS
Cited by 4 scholarly publications.
Telescopes
Optical fabrication
Cameras
Mirrors
Control systems
Solar processes
Observatories