29 August 2022 Status of the ESO's ELT construction
Roberto Tamai, Bertrand Koehler, Michele Cirasuolo, Fabio Biancat-Marchet, Mauro Tuti, Juan-Carlos González Herrera, Suzanne Ramsay
Author Affiliations +
Abstract
Within a difficult and uncertain environment resulting from the COVID-19 pandemic as well as the global geopolitical and economic situation, the ESO’s Extremely Large Telescope (ELT) is progressing on all fronts of design, product and process qualification, manufacturing, subsystem assembly and the two M1 segment coating plants have just been commissioned in the dedicated ELT Technical Facility building at Paranal. The scientific Instruments are now undergoing their final design reviews while series production for the various components constituting the 39 m diameter segmented primary mirror (M1) is well underway. On Cerro Armazones the raft foundations for the dome and for telescope structure are being poured and the piers start to rise above ground. On the programmatic level, all deferred subsystems (so-called phase 2 items) are now funded, and the budget has been moderately increased to account also for infrastructure upgrade needed to fully and optimally integrate the ELT into the Paranal (VLT) Observatory operation scheme. After a year of complete closure of the construction site and other delays in several contracts due to the pandemic and technical difficulties, the programme schedule has been adjusted and Scientific First Light is planned by the end of 2027.
Conference Presentation
© (2022) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Roberto Tamai, Bertrand Koehler, Michele Cirasuolo, Fabio Biancat-Marchet, Mauro Tuti, Juan-Carlos González Herrera, and Suzanne Ramsay "Status of the ESO's ELT construction", Proc. SPIE 12182, Ground-based and Airborne Telescopes IX, 121821A (29 August 2022); https://doi.org/10.1117/12.2631613
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Mirrors

Telescopes

Manufacturing

Control systems

Sensors

Domes

Coating

RELATED CONTENT

Rubin Observatory Simonyi Survey Telescope status overview
Proceedings of SPIE (August 26 2022)
The ESO's ELT construction status
Proceedings of SPIE (July 06 2018)
The current status of the UK-FMOS spectrograph
Proceedings of SPIE (September 30 2004)
Manufacturing optics of a 2.5m telescope
Proceedings of SPIE (September 17 2012)
VISTA: project status
Proceedings of SPIE (June 23 2006)

Back to Top