Paper
8 June 1995 Initial proposal for the ORM 8-m telescope control system design
Nicolas A. Sosa, Heidi Moreno-Arce, Juan Paris P. Gonzalez, Peter L. Hammersley, Carlos Martin-Diaz, Jose Miguel Rodriguez-Espinosa, Luis Fernando Rodriguez-Ramos, Brian Mack
Author Affiliations +
Abstract
The Instituto de Astrofisica de Canarias (IAC) is taking preliminary steps towards the building of an 8-m class optical-infrared telescope to be placed at the Observatorio del Roque de Los Muchachos (ORM) on the island of La Palma in the Canary Islands, Spain. This paper presents a brief description of the preliminary conceptual design of the control system for the telescope and its instrumentation in all planned modes of observation and configurations. An outline of the devices that are to be controlled and the functions that are to be performed is presented, together with a description of the system architecture. The system will be distributed and highly modular, and will allow for an easy and efficient exchange of instruments, focal stations and observing modes. It will also be designed so that technological upgrades can be implemented at low cost and minimum down-time.
© (1995) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Nicolas A. Sosa, Heidi Moreno-Arce, Juan Paris P. Gonzalez, Peter L. Hammersley, Carlos Martin-Diaz, Jose Miguel Rodriguez-Espinosa, Luis Fernando Rodriguez-Ramos, and Brian Mack "Initial proposal for the ORM 8-m telescope control system design", Proc. SPIE 2479, Telescope Control Systems, (8 June 1995); https://doi.org/10.1117/12.211433
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Control systems

Local area networks

Mirrors

Control systems design

Stars

Computer programming

RELATED CONTENT

Generic object-oriented telescope control system
Proceedings of SPIE (December 13 2002)
Introduction of a 2.5m telescope mount
Proceedings of SPIE (July 23 2008)
Introduction of a 2.5m telescope mount and its performance
Proceedings of SPIE (August 05 2010)

Back to Top