Abstract
In the process of road surface construction, dispatchers' scheduling was experiential and blindfold in some degree and static scheduling restricted the continuity of the construction. Serious problems such as labor holdup, material awaiting and scheduling delay could occur when the old scheduling technique was used. This paper presents ant colony algorithm based on MAS that has the abilities of intelligentized modeling and dynamic scheduling. MAS model deals with single agent's communication and corresponding in engineering machinery of clusters firstly, next we apply ant colony algorithm to solve dynamic scheduling in the plant. Ant colony algorithm can optimize the match of agents and make the system dynamic balance. The effectiveness of the proposed method is demonstrated with MATLAB simulations.
© (2006) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Qiang Gao, Hongli Wang, Long Guo, and Jianping Xiang "Dynamic scheduling study on engineering machinery of clusters using multi-agent system ant algorithm", Proc. SPIE 6042, ICMIT 2005: Control Systems and Robotics, 60421U (2 May 2006); https://doi.org/10.1117/12.664632
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Roads

Evolutionary algorithms

MATLAB

Information fusion

Communication engineering

Data centers

Data modeling

Back to Top