Paper
4 August 2014 Project management for complex ground-based instruments: MEGARA plan
María Luisa García-Vargas, Ana Pérez-Calpena, Armando Gil de Paz, Jesús Gallego, Esperanza Carrasco, Raquel Cedazo, Jorge Iglesias
Author Affiliations +
Abstract
The project management of complex instruments for ground-based large telescopes is a challenge itself. A good management is a clue for project success in terms of performance, schedule and budget. Being on time has become a strict requirement for two reasons: to assure the arrival at the telescope due to the pressure on demanding new instrumentation for this first world-class telescopes and to not fall in over-costs. The budget and cash-flow is not always the expected one and has to be properly handled from different administrative departments at the funding centers worldwide distributed. The complexity of the organizations, the technological and scientific return to the Consortium partners and the participation in the project of all kind of professional centers working in astronomical instrumentation: universities, research centers, small and large private companies, workshops and providers, etc. make the project management strategy, and the tools and procedures tuned to the project needs, crucial for success. MEGARA (Multi-Espectrógrafo en GTC de Alta Resolución para Astronomía) is a facility instrument of the 10.4m GTC (La Palma, Spain) working at optical wavelengths that provides both Integral-Field Unit (IFU) and Multi-Object Spectrograph (MOS) capabilities at resolutions in the range R=6,000-20,000. The project is an initiative led by Universidad Complutense de Madrid (Spain) in collaboration with INAOE (Mexico), IAA-CSIC (Spain) and Universidad Politécnica de Madrid (Spain). MEGARA is being developed under contract with GRANTECAN.
© (2014) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
María Luisa García-Vargas, Ana Pérez-Calpena, Armando Gil de Paz, Jesús Gallego, Esperanza Carrasco, Raquel Cedazo, and Jorge Iglesias "Project management for complex ground-based instruments: MEGARA plan", Proc. SPIE 9150, Modeling, Systems Engineering, and Project Management for Astronomy VI, 91500Y (4 August 2014); https://doi.org/10.1117/12.2055935
Lens.org Logo
CITATIONS
Cited by 2 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Collimators

Silica

Polishing

Coating

Manufacturing

Optics manufacturing

Prisms

RELATED CONTENT

MEGARA optical manufacturing process
Proceedings of SPIE (July 24 2014)
4MOST: MAIT of the high-resolution-spectrograph
Proceedings of SPIE (August 29 2022)
MEGARA spectrograph optics
Proceedings of SPIE (September 24 2012)

Back to Top