In order to solve the problem of unreasonable distribution of maintenance resources under current power distribution equipment maintenance modes, an optimization model for power distribution equipment maintenance planning considering maintenance risks and failure risks is proposed in this paper. We take the minimum sum of maintenance risk and failure risk as the objective function to optimize the maintenance mode and the maintenance frequency. The maintenance risks include maintenance costs and maintenance plan losses. In addition, we consider the constraints of maintenance capability, coordinated maintenance, mutually exclusive maintenance and grid radial operation to make the optimization plan closer to the actual state of the power grid and equipment. The particle swarm intelligent algorithm is used to solve the model. Finally, the proposed model and algorithm are verified by the IEEE-RBTS BUS5 power distribution system.
Access to the requested content is limited to institutions that have purchased or subscribe to SPIE eBooks.
You are receiving this notice because your organization may not have SPIE eBooks access.*
*Shibboleth/Open Athens users─please
sign in
to access your institution's subscriptions.
To obtain this item, you may purchase the complete book in print or electronic format on
SPIE.org.
INSTITUTIONAL Select your institution to access the SPIE Digital Library.
PERSONAL Sign in with your SPIE account to access your personal subscriptions or to use specific features such as save to my library, sign up for alerts, save searches, etc.